Alternatively screw rows of treated 1x4s to the concrete 16 in.
How to lay timber flooring on concrete.
Lay down a moisture barrier.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Here are some of our tips for preparing concrete before laying your hardwood timber floor.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
This will prevent any excess moisture from wicking from the concrete directly into the wood.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Normal room temperature and humidity conditions must be maintained for the entire.
Moisture can ruin your flooring before you even install it so avoid bringing the flooring into the installation space until the concrete is dry.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Always have an exit plan when laying out the floor.
If you are using an old floor and it has previous paint you ll have no other option but to remove it.
Unpack the flooring and spread it around the room to acclimate.
Flooring usually takes three to five days to acclimate but the real test of acclimation is when its moisture content as measured by a meter has fallen to within 4 percent of that of the subfloor.
Follow these steps with care to safely complete the installation yourself.
You don t want be trapped in a corner and have to walk on the newly installed floors.
Install a underlayment on concrete floor in basement over the moisture barrier to help soundproof your floor.
Lay the floor parallel to longest wall in the room.
By eliminating the paint it ensures that the adhesive is going to stick to your concrete.