There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
How to install bamboo click flooring on concrete.
The two main installation methods over concrete.
The beauty and efficiency of bamboo click flooring may depend on the installation process on some levels.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.
This means looking at either the strand woven click bamboo or the 9mm bamboo.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
Floating the floor using tongue and groove flooring not parquet block 2.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
Secret nailing the floor down to a wood subfloor.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
Click here to cancel reply.
Floating the floor using uniclic flooring.
At the onset of the development of bamboo floors staples and glues were used to keep the floor in place.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any sealers.
We have provided all of the steps you need to know in order to install bamboo on a concrete subfloor as well as how to maintain if afterwards.
Gluing the floor down to a concrete or wood.
This would be the fastest and easiest for you to install your bamboo flooring.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.